Consensus On Pre-commissioning Stages For Cogeneration And Combined Cycle Power Plants

Consensus On Pre-commissioning Stages For Cogeneration And Combined Cycle Power Plants
by Roger W. Light / / / PDF


Read Online 2.2 MB Download


This publication is an important adjunct to several previously published

documents prepared to inform, educate and assist the reader in adequately

considering and planning for the many major activities involved in the design,

construction and start-up of cogeneration and combined cycle power plants.

Experience has shown that failure to consider the complex interrelationships

between the various component systems can result in costly delays in project

completion and turn over dates. Additionally, incorrect procedures and planning

can result in damage or failure of key pieces of equipment or systems during

subsequent operation.

This consensus was prepared by a task group of this subcommittee under the

leadership of Edward Beardwood. The task group consisted of representatives of

manufacturers, operators and consultants involved with the planning, design,

manufacture, operation and monitoring of industrial and utility boilers, steam

generators and associated equipment and systems.

The ASME Research and Technology Committee on Water and Steam in

Thermal Systems will review, revise and reissue this document from time to time

as necessary to comply with advances in technology in the design of these plants

and the water treatment options.

views: 541